ALL WORKS
Structural portfolio.
All
Strategic Budgeting
Architectural Exterior
Interior Design
Concept & Planning
ALL WORKS
Structural portfolio.
All
Strategic Budgeting
Architectural Exterior
Interior Design
Concept & Planning

FEATURED CASE STUDY
The Vanguard Towers.
The primary challenge was engineering an 80-story asymmetric mass on shifting coastal sands. We deployed a deep-pile foundation matrix paired with active tuned mass dampers to completely neutralize extreme seismic and wind loads. The result is a structural masterpiece that redefines the regional skyline while operating at absolute thermal efficiency.
GROSS AREA
1.2M sq ft
PROJECT VALUE
£450M
DURATION
36 Months
PRIMARY SERVICE
Architectural Exterior

FEATURED CASE STUDY
The Vanguard Towers.
The primary challenge was engineering an 80-story asymmetric mass on shifting coastal sands. We deployed a deep-pile foundation matrix paired with active tuned mass dampers to completely neutralize extreme seismic and wind loads. The result is a structural masterpiece that redefines the regional skyline while operating at absolute thermal efficiency.
GROSS AREA
1.2M sq ft
PROJECT VALUE
£450M
DURATION
36 Months
PRIMARY SERVICE
Architectural Exterior
COMPLETED BUILDS IN ARCHIVE
COUNTRIES WORLDWIDE
AWARD-WINNING STRUCTURES
COMPLETED BUILDS IN ARCHIVE
COUNTRIES WORLDWIDE
AWARD-WINNING STRUCTURES

CONTACT US
Let's build your vision.
Ready to translate your architectural ambitions into a structural reality? Partner with Edison for uncompromising precision.

CONTACT US
Let's build your vision.
Ready to translate your architectural ambitions into a structural reality? Partner with Edison for uncompromising precision.






